True Line Electrical

Builder Electrical Services

Temporary Power for Construction Sites Melbourne

Construction site power solutions for builders. Licensed REC 38009.

Every construction site needs reliable temporary power before permanent electrical systems are installed. True Line Electrical provides fast, compliant temporary power solutions for Melbourne builders, including builder's boards, temporary meter installations, and generator connections. We understand construction timelines and can often install temporary power within 24-48 hours of request.

What is Temporary Power?

Temporary power (also called builder's supply or construction power) provides electricity to a construction site before the permanent electrical system is installed. This typically involves a temporary meter board installed at the property boundary, connected to the electricity network. The builder's board provides power outlets for tools, lighting, and equipment used during construction. Once the permanent switchboard is installed and connected, the temporary supply is removed.

Our Temporary Power Process

1

Site Assessment

Assess power requirements, meter location, and connection point.

2

Application

Submit application to electricity distributor for temporary connection.

3

Board Installation

Install temporary meter board with appropriate outlets and protection.

4

Connection

Coordinate with distributor for meter installation and power connection.

5

Testing

Test all outlets and safety devices, issue compliance certificate.

6

Removal

Remove temporary supply once permanent power is connected.

Why Choose True Line Electrical

Fast installation - often within 48 hours
Compliant with distributor requirements
Multiple outlet configurations available
RCD protection on all outlets
Weatherproof enclosures
Removal included when no longer needed

Frequently Asked Questions

How long does temporary power installation take?

We can typically install the temporary board within 1-2 days. Connection by the electricity distributor may take an additional 5-10 business days depending on their schedule.

What power outlets are included?

Standard builder's boards include 10A and 15A outlets. We can add 3-phase outlets or additional circuits based on your site requirements.

Do I need temporary power for a renovation?

If the existing power supply will be disconnected during renovation, temporary power may be needed. Often we can maintain existing supply during renovation work.

Who pays for the temporary power usage?

The builder or property owner is responsible for electricity usage on the temporary meter. We install the board; the distributor installs the meter and manages billing.

Ready to Get Started?

Contact us today for a free quote on your temporary power project.