Every construction site needs reliable temporary power before permanent electrical systems are installed. True Line Electrical provides fast, compliant temporary power solutions for Melbourne builders, including builder's boards, temporary meter installations, and generator connections. We understand construction timelines and can often install temporary power within 24-48 hours of request.
What is Temporary Power?
Temporary power (also called builder's supply or construction power) provides electricity to a construction site before the permanent electrical system is installed. This typically involves a temporary meter board installed at the property boundary, connected to the electricity network. The builder's board provides power outlets for tools, lighting, and equipment used during construction. Once the permanent switchboard is installed and connected, the temporary supply is removed.
Our Temporary Power Process
Site Assessment
Assess power requirements, meter location, and connection point.
Application
Submit application to electricity distributor for temporary connection.
Board Installation
Install temporary meter board with appropriate outlets and protection.
Connection
Coordinate with distributor for meter installation and power connection.
Testing
Test all outlets and safety devices, issue compliance certificate.
Removal
Remove temporary supply once permanent power is connected.
Why Choose True Line Electrical
Frequently Asked Questions
How long does temporary power installation take?
We can typically install the temporary board within 1-2 days. Connection by the electricity distributor may take an additional 5-10 business days depending on their schedule.
What power outlets are included?
Standard builder's boards include 10A and 15A outlets. We can add 3-phase outlets or additional circuits based on your site requirements.
Do I need temporary power for a renovation?
If the existing power supply will be disconnected during renovation, temporary power may be needed. Often we can maintain existing supply during renovation work.
Who pays for the temporary power usage?
The builder or property owner is responsible for electricity usage on the temporary meter. We install the board; the distributor installs the meter and manages billing.